The customer, Bluestone National Park Holiday Resort, has a water world that was heated by biomass boilers situated in an adjacent Energy Centre. The original biomass system was installed in 2007 and had no heat accumulation capacity, often running all night with low demand as there was no capacity to automatically shut boilers down and re-start.